The pictures from the last week of July was unsorted and in a mess, so I decided to add a mix of things happening this week. Painted house and the outside lamps in place. The contrast between the "Smoky white" house color and the teak wood is quite nice (my opinion). Under the bedrooms there are no ceiling, so the lamps and wire is more visible. We have choosen LED lamps everywhere in the house. I think the painters are ready with the front stairs now. Front view of the house. On the right you can see the skeleton of the roof over the parking. Working on the parking roof structure. Strating with the first tiles in the living room. Some progress The team was fixing the fresh water piping. There will be option for community water and well. To be sure to always have water we have a small (1000 L) tank by the house. Pump from tank to house
This is a blog about building a house in eastern Thailand from beginning to end. The house will be used by me and my future wife Ang when I quit my work and retire. You can read more about us in another part of this blog.
The small place Kram is located about 200 km from Bangkok, 3 km to Gulf of Thailand and a long sandy beach.
Observe that the blog shows the last entry first and older below in reverse order! (Can be many pages)