Skip to main content

Mixed pictures from last 4 days

I will share some mixed pictures from the site 20-24/7 2018.

Primer on the fence

It's a lot to paint

Roof construction on the parking has now started

Sanding the wood floor in one of the bedrooms.

Electricians are in place - looks so young - I wonder if their parents know where they are.

Entrance

Entrance stairs

We have got some lamps in place.

More to paint.

A lot of metal is needed on the roof construction.

Windows to the dining and living room

A lot of air

Fixing the floor in bedroom.

Windows from the master bedroom.

More windows

Last layer of paint on the outside (I  guess)

Fence work on the front.

It starts to look like a real house

The front wooden floor by the entrance, with natural differences in the pattern.

Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser