Skip to main content

Mixed pictures from last 4 days

I will share some mixed pictures from the site 20-24/7 2018.

Primer on the fence

It's a lot to paint

Roof construction on the parking has now started

Sanding the wood floor in one of the bedrooms.

Electricians are in place - looks so young - I wonder if their parents know where they are.

Entrance

Entrance stairs

We have got some lamps in place.

More to paint.

A lot of metal is needed on the roof construction.

Windows to the dining and living room

A lot of air

Fixing the floor in bedroom.

Windows from the master bedroom.

More windows

Last layer of paint on the outside (I  guess)

Fence work on the front.

It starts to look like a real house

The front wooden floor by the entrance, with natural differences in the pattern.

Comments

Popular posts from this blog

Blueprint

The first version of the blueprint. About half of the house is one floor, the bedrooms are raised as a second floor with mostly open areas below (laundry and outdoor relax area). I guess there will be some small changes here and there during the building process, but in general this is the house. Even if it looks like that, we will not have any cars under the bedroom.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Pictures from downstairs

Some pictures from today.