We started prepare the land in May/April 2016 so that there should be at least one rainy season before we started to build. Everyone says that is needed so that the soil will be proper packed. After adding soil from 25 big trucks we also got help to get the ground slope down to the road to help getting rid of water on heavy rains. I here have some pictures of this event:
This is a blog about building a house in eastern Thailand from beginning to end. The house will be used by me and my future wife Ang when I quit my work and retire. You can read more about us in another part of this blog.
The small place Kram is located about 200 km from Bangkok, 3 km to Gulf of Thailand and a long sandy beach.
Observe that the blog shows the last entry first and older below in reverse order! (Can be many pages)