Land Preparation

We started prepare the land in May/April 2016 so that there should be at least one rainy season before we started to build. Everyone says that is needed so that the soil will be proper packed.
After adding soil from 25 big trucks we also got help to get the ground slope down to the road to help getting rid of water on heavy rains.
I here have some pictures of this event:






Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser