Skip to main content

Assorted from last week of July

The pictures from the last week of July was unsorted and in a mess, so I decided to add a mix of things happening this week.

Painted house and the outside lamps in place. The contrast between the "Smoky white" house color and the teak wood is quite nice (my opinion).

Under the bedrooms there are no ceiling, so the lamps and wire is more visible. We have choosen LED lamps everywhere in the house.

I think the painters are ready with the front stairs now.

Front view of the house. On the right you can see the skeleton of the roof over the parking.

Working on the parking roof structure.

Strating with the first tiles in the living room.

Some progress



The team was fixing the fresh water piping. There will be option for community water and well. To be sure to always have water we have a small (1000 L) tank by the house.


Pump from tank to house



Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Many bars

Back to work, Today the workers done many rebar "cages" after delivery of materials and a rebar machine. The three cages that was done before was made of 16 mm rebar that was a leftover from their last work. Now the rebar is 12 mm (as planned). Some pictures: