Assorted from last week of July

The pictures from the last week of July was unsorted and in a mess, so I decided to add a mix of things happening this week.

Painted house and the outside lamps in place. The contrast between the "Smoky white" house color and the teak wood is quite nice (my opinion).

Under the bedrooms there are no ceiling, so the lamps and wire is more visible. We have choosen LED lamps everywhere in the house.

I think the painters are ready with the front stairs now.

Front view of the house. On the right you can see the skeleton of the roof over the parking.

Working on the parking roof structure.

Strating with the first tiles in the living room.

Some progress



The team was fixing the fresh water piping. There will be option for community water and well. To be sure to always have water we have a small (1000 L) tank by the house.


Pump from tank to house



Comments

Popular posts from this blog

Moving the Office

One of the first things that the team set up on the land was the small BIO (Building Inspector office). Now its time to dig here for the waste-water pipes and also the place where the parking should be set up. So the move was done this morning.

Roof - Part 2

The roof took three days. The put tiles both on the high roof and most part on the lower roof. They decided to wait with the part that is between the big and low part because the plastering work on the high wall could make the tiles very dirty and difficult to clean after. Another solution should have been covering the part, but that was not an option - they are the experts, so it's just to lean back and let them do what they want. Lats and lifting tiles. Some parts done Under the high roof Notice the security hooks and helmets (not?). Low roof Most ready now. The team will now wait for the plastering work on the outer walls on the high part and then its time to finishing up.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels