OK, some more fence

The fence will be finished in some days, I have to share some pictures on how it looks now.

Mounting the metal bars between the pillars.


Mounting....

Hope it will be stable enough - it's 4 meeters between the pillars.


Mounting conwood (wood alike fiber concrete)

How it looks on the nabor side.

Pinaters have started to put on primer on the conwood. Later on they will look like teak.

Again from the nabors land.

Mounting on the other side. Totally 80 meters of the fence should have conwood

Will be nice when ready. The four meters was to much for the weight, so there will be some help in the middle (as shown on the picture)

Comments

Popular posts from this blog

Moving the Office

One of the first things that the team set up on the land was the small BIO (Building Inspector office). Now its time to dig here for the waste-water pipes and also the place where the parking should be set up. So the move was done this morning.

Roof - Part 2

The roof took three days. The put tiles both on the high roof and most part on the lower roof. They decided to wait with the part that is between the big and low part because the plastering work on the high wall could make the tiles very dirty and difficult to clean after. Another solution should have been covering the part, but that was not an option - they are the experts, so it's just to lean back and let them do what they want. Lats and lifting tiles. Some parts done Under the high roof Notice the security hooks and helmets (not?). Low roof Most ready now. The team will now wait for the plastering work on the outer walls on the high part and then its time to finishing up.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels