Todays house pictures

Some pictures on how it looks August 21, 2018.

Monday - August 20

A lot of cleaning today. In the evening our fox-tails arrived! Cleaning laundry Fixing and cleaning. Some new plants in the pots, I guess it's Magnolia. More cleaning Cleaning ...and of cause painting more painting and our red palm (still alive) This pictures shows our two new foxtail palms - arrived late Monday evening.

The rest of the third week in August

A mix again. Tile-man still working. This time by the entrance. Priming the fence. This hole will be filled with concrete and hold the pillar for the small roof over the well. More about that later... Primer and three layer of teak color will get this result. Now the white part under need to be fixed. This picture is taken from the neighbors garden. Some of the workers are doing 100% cleaning work, here in the relax area. Wow - after this bio-tabs in the black water tank, we can start using the toilets! Some of the workers are fixing a roof over the well (and pump) Tiles ready by the entrance Painting One of the three aircon units. Ugly - but nice to have. Some soild delivered. Adding soil where needed. Painting... This is picture number 1000 this month. The fence will be nice (my opinion) More painting. The small bush/tree in the front is Pomegranate. Some soil in place. Late on Sunday, our red p...

Monday 13

A lot of pictures today. The worker normally taking photos have left, so now the foreman have taken over this task. I think the quality of the pictures are better now. We decided to put some bricks between the parking and the gate entrance. After some calculation we  found out that a little more than 4000 bricks was needed. It took some time for the workers to put in place. Here they got help from a minor, she carried bricks and also tried to mount some. Soon finished Time to put tiles on the back deck. more of that The result is good. We now have running water. In many places The level tool is very handy when mounting things that looks best if they are in level - like the kitchen hood. Air condition, gutter pipe and some stones along the house. This house will soon be ready. We got an address of the house Easy .... Nine slash 4, Moo 1

Rest of the second week in August

A lot of rain, so everything slows down. Some of the workers gave to move on to another building site - a good sign that there is less to do here. Thai kitchen tiles in place Two rooms for workers are here removed.  Two worker families left for new site in Bangkok. .. leaving some open soil... Bathroom are more or less finished. You can always find a toilet shower in Thailand. Mounting things in bathroom

August 7-8 - a lot is happening

There was a very active site this two days. By the entrance to the site the concrete had to be added, mounting air condition equipment, the roof of the parking and a lot more happened this days. Gate:  This was dane a couple of days ago. Here the rail for the gate will be mounted (in concrete) Form for gate entrance concrete Sand and vibrator And concrete from the truck. Parking: Mounting tiles on the parking I hope they don't fall down. A half day work for them So they continued to fix some reclamations from when they mounted tiles on the main house (up in the triangle). Others: Air condition in place. It started to rain in the afternoon, so the guys fixing the air condition went home and will return tomorrow for the pipes and test. Yes - The things you see on the floor is IKEA Metod (Kitchen cabinets). All ready floors has to be protected by thick paper, here is the covering team today. ... kitchen ti...