August 7-8 - a lot is happening

There was a very active site this two days. By the entrance to the site the concrete had to be added, mounting air condition equipment, the roof of the parking and a lot more happened this days.

Gate:
 This was dane a couple of days ago. Here the rail for the gate will be mounted (in concrete)

Form for gate entrance concrete

Sand and vibrator

And concrete from the truck.


Parking:

Mounting tiles on the parking

I hope they don't fall down.

A half day work for them

So they continued to fix some reclamations from when they mounted tiles on the main house (up in the triangle).


Others:


Air condition in place. It started to rain in the afternoon, so the guys fixing the air condition went home and will return tomorrow for the pipes and test.
Yes - The things you see on the floor is IKEA Metod (Kitchen cabinets).


All ready floors has to be protected by thick paper, here is the covering team today.

... kitchen tile work these days too.



Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser