Monday 13

A lot of pictures today. The worker normally taking photos have left, so now the foreman have taken over this task. I think the quality of the pictures are better now.



We decided to put some bricks between the parking and the gate entrance. After some calculation we  found out that a little more than 4000 bricks was needed. It took some time for the workers to put in place.
Here they got help from a minor, she carried bricks and also tried to mount some.


Soon finished

Time to put tiles on the back deck.

more of that

The result is good.

We now have running water.

In many places

The level tool is very handy when mounting things that looks best if they are in level - like the kitchen hood.


Air condition, gutter pipe and some stones along the house. This house will soon be ready.


We got an address of the house

Easy ....
Nine slash 4, Moo 1




Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Many bars

Back to work, Today the workers done many rebar "cages" after delivery of materials and a rebar machine. The three cages that was done before was made of 16 mm rebar that was a leftover from their last work. Now the rebar is 12 mm (as planned). Some pictures: