The work goes on

For some days now, the progress have focused on the roof and not so much on the rest of the building. But now it looks like there will be a lot tasks to be started that really change the looks of the house. I have collected some pictures from the last three days.

The tree under the bedrooms are more or less gone, the upper floor is now strong enough, soon time to get the roof beams in place here too.

Removing all the tree under the upper floor takes some time.

This will be the laundry room, under roof but open on two of the sides.

The roof on the lower part of the house is more or less done now. They are painting the last parts now. Soon its time for the high level roof structure and then the roof tile team from SCG will arrive.

Today the truck with aerated lightweight concrete blocks arrived. Soon time to get walls. 




The blocks are very easy to put in place. But I guess they need some mortar too.

Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser