Many bars

Back to work,
Today the workers done many rebar "cages" after delivery of materials and a rebar machine.
The three cages that was done before was made of 16 mm rebar that was a leftover from their last work. Now the rebar is 12 mm (as planned).
Some pictures:



Comments

Popular posts from this blog

Blueprint

The first version of the blueprint. About half of the house is one floor, the bedrooms are raised as a second floor with mostly open areas below (laundry and outdoor relax area). I guess there will be some small changes here and there during the building process, but in general this is the house. Even if it looks like that, we will not have any cars under the bedroom.