Skip to main content

Pictures from the first week of September 2018

A lot is happening now. The painters still have a lot to do and there is some small work for the electricians (2-4 hours work). We are soon reaching the end of this building project.

Where is a bunch of pictures:



















Comments

Popular posts from this blog

Blueprint

The first version of the blueprint. About half of the house is one floor, the bedrooms are raised as a second floor with mostly open areas below (laundry and outdoor relax area). I guess there will be some small changes here and there during the building process, but in general this is the house. Even if it looks like that, we will not have any cars under the bedroom.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Pictures from downstairs

Some pictures from today.