Small road

We have decided to add grass in the front, sides and some meters on the back. We also know that there can be some transports to and from the back fruit-garden. To avoid the grass from be ruined during the wet seasons, we are putting blocks into the grass like a small road. These blocks will be filled and hopefully covered with grass over time. By the way - the grass will be delivered in the end of August.

Here is some pictures from the hole-block work.

Delivery of the blocks. This was not enough so we ordered a lot more after we noticed that.

Digging
Preparation

First blocks

Progress

Ready before grass



Comments

Popular posts from this blog

Moving the Office

One of the first things that the team set up on the land was the small BIO (Building Inspector office). Now its time to dig here for the waste-water pipes and also the place where the parking should be set up. So the move was done this morning.

Roof - Part 2

The roof took three days. The put tiles both on the high roof and most part on the lower roof. They decided to wait with the part that is between the big and low part because the plastering work on the high wall could make the tiles very dirty and difficult to clean after. Another solution should have been covering the part, but that was not an option - they are the experts, so it's just to lean back and let them do what they want. Lats and lifting tiles. Some parts done Under the high roof Notice the security hooks and helmets (not?). Low roof Most ready now. The team will now wait for the plastering work on the outer walls on the high part and then its time to finishing up.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels