Planting and grass

We ordered some plants and grass from a garden shop in Klaeng. The garden workers normally works in a factory during daytime, so a lot of work is done in the evenings. Here is some work done over two days and some results.

Preparations

First grass in place

More grass in place

The big tree on the left was planted this evening too. I do not know any western name on it, but will have nice flowers (according to Ang).

More grass, most of the grass is called "Japanese grass", but the grass used in the shade areas in the back of the parking is called "Malaysian grass".

Day after, results on the back.

Also on the back. Many cubic meters of waters was used during the planting. Today, there are one person just watering more to get the grass to survive.

Front side. A worker just started to plant grass in the holes in the "road" blocks.


Front

Ang planted some "Kroton" plants between the parking and the fence.

From the opposit land in front of our house.

Comments

Popular posts from this blog

Moving the Office

One of the first things that the team set up on the land was the small BIO (Building Inspector office). Now its time to dig here for the waste-water pipes and also the place where the parking should be set up. So the move was done this morning.

Roof - Part 2

The roof took three days. The put tiles both on the high roof and most part on the lower roof. They decided to wait with the part that is between the big and low part because the plastering work on the high wall could make the tiles very dirty and difficult to clean after. Another solution should have been covering the part, but that was not an option - they are the experts, so it's just to lean back and let them do what they want. Lats and lifting tiles. Some parts done Under the high roof Notice the security hooks and helmets (not?). Low roof Most ready now. The team will now wait for the plastering work on the outer walls on the high part and then its time to finishing up.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels