Skip to main content

Keep clean

One of the points in the contract with the builder is that the garbage should be removed to keep the site clean. The workers are very good doing this. I saw that they even cleanded the road outside after the trucks was arriving with sand and soil. Here they are filling the small truck with left overs



Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Many bars

Back to work, Today the workers done many rebar "cages" after delivery of materials and a rebar machine. The three cages that was done before was made of 16 mm rebar that was a leftover from their last work. Now the rebar is 12 mm (as planned). Some pictures: