Fencing work never ends

Today there was more work done on the fences, I am not sure if I should have more fence pictures - but OK - here are some from the work done today.

Between our future fruit-garden (now temporary houses for the labors) and our nabors fruit-garden there will be a more simple fence than on the front.


This is in the far end of the land. The nabor on this side have a turtle farm, he is also working in the Tessaban (Comunity Hall). The big bush on the right side of the picture is our Bambu area.
(Bambu is a grass).


Here you can see some of our very small fruit-trees

To the right is our nabors fruit-trees


To our left is a non-sold piece of land, just nothing right now. Anyone want to buy?


The fence is strong here in the front. There is still some work before it's ready.

We will keep a small road on this side of the house for transports to the fruit-garden on the back.

Front

Still much to do

The fence is quite long - 115 meters on this side


The pipes in the fron came today. It is not ours, so we think it could be for the community water that we have been promised to get this year.

As you can see in the sky, the rainy season have started now.



Comments

Popular posts from this blog

Moving the Office

One of the first things that the team set up on the land was the small BIO (Building Inspector office). Now its time to dig here for the waste-water pipes and also the place where the parking should be set up. So the move was done this morning.

Roof - Part 2

The roof took three days. The put tiles both on the high roof and most part on the lower roof. They decided to wait with the part that is between the big and low part because the plastering work on the high wall could make the tiles very dirty and difficult to clean after. Another solution should have been covering the part, but that was not an option - they are the experts, so it's just to lean back and let them do what they want. Lats and lifting tiles. Some parts done Under the high roof Notice the security hooks and helmets (not?). Low roof Most ready now. The team will now wait for the plastering work on the outer walls on the high part and then its time to finishing up.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels