Additional pictures from beginning May 2018

Here is some assorted pictures from beginning of May

Working with curb (around the house)

Front

Back 

Painter doing some pre-work

The hall

Front

Left side - curb and concrete around windows

Tank/pump area on the back

A nice window frame

Toilet and storage windows

The roof is done now

From left-back side

Dining room windows

Entrance

One of the bedrooms

Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser