Additional pictures from beginning May 2018

Here is some assorted pictures from beginning of May

Working with curb (around the house)

Front

Back 

Painter doing some pre-work

The hall

Front

Left side - curb and concrete around windows

Tank/pump area on the back

A nice window frame

Toilet and storage windows

The roof is done now

From left-back side

Dining room windows

Entrance

One of the bedrooms