Tiles

In the beginning of March we went to the big material shop in Pattaya - Boonthavorn to buy all the needed floor and wall tiles, this exercises took almost the whole day.
After some days the tiles were delivered to the building site in a safe and good way. This is maybe the first time I have seen well packed, and securely strapped goods on a truck. They even used a crane to unload.
Different from the 4000+ tiles we got for the roof some days earlier. Not strapped and moved from the trucks to the ground by hand.





I have two pictures from the tile shop, the material here is not tree, it's concrete. 
Good way to avoid the termites but get the look.


What is the price on this?



Comments

Popular posts from this blog

Blueprint

The first version of the blueprint. About half of the house is one floor, the bedrooms are raised as a second floor with mostly open areas below (laundry and outdoor relax area). I guess there will be some small changes here and there during the building process, but in general this is the house. Even if it looks like that, we will not have any cars under the bedroom.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Pictures from downstairs

Some pictures from today.