Roof - Part 1

The roof team was delayed due to some rain, but now they are here.
There are many tiles to lift up to the roof, so 6 people are really needed.
When I visited in the morning there was three persons working with the lift to the second floor by throwing the tiles. When they saw me they took a break and after that there was five persons instead to avoid the dramatic throws. I did not get the throwing on video, was a bit slow for that.

Here is the video then they are five persons though:


Some photos of the process to add tiles:

Phone break

The tiles are piling up



Mounting the tile lath.


Comments

Popular posts from this blog

Blueprint

The first version of the blueprint. About half of the house is one floor, the bedrooms are raised as a second floor with mostly open areas below (laundry and outdoor relax area). I guess there will be some small changes here and there during the building process, but in general this is the house. Even if it looks like that, we will not have any cars under the bedroom.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Pictures from downstairs

Some pictures from today.