Roof - Part 1

The roof team was delayed due to some rain, but now they are here.
There are many tiles to lift up to the roof, so 6 people are really needed.
When I visited in the morning there was three persons working with the lift to the second floor by throwing the tiles. When they saw me they took a break and after that there was five persons instead to avoid the dramatic throws. I did not get the throwing on video, was a bit slow for that.

Here is the video then they are five persons though:


Some photos of the process to add tiles:

Phone break

The tiles are piling up



Mounting the tile lath.


Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Many bars

Back to work, Today the workers done many rebar "cages" after delivery of materials and a rebar machine. The three cages that was done before was made of 16 mm rebar that was a leftover from their last work. Now the rebar is 12 mm (as planned). Some pictures:

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!