Preparation of the inner walls before plastering

The labors have to wait for the roof team to put on the roof tiles. They then spend some time to start prepare the walls in the bedrooms for plastering. This is done by adding a very fine net on the concrete parts of the wall.





Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Many bars

Back to work, Today the workers done many rebar "cages" after delivery of materials and a rebar machine. The three cages that was done before was made of 16 mm rebar that was a leftover from their last work. Now the rebar is 12 mm (as planned). Some pictures: