Preparation of the inner walls before plastering

The labors have to wait for the roof team to put on the roof tiles. They then spend some time to start prepare the walls in the bedrooms for plastering. This is done by adding a very fine net on the concrete parts of the wall.





Comments

Popular posts from this blog

Blueprint

The first version of the blueprint. About half of the house is one floor, the bedrooms are raised as a second floor with mostly open areas below (laundry and outdoor relax area). I guess there will be some small changes here and there during the building process, but in general this is the house. Even if it looks like that, we will not have any cars under the bedroom.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Pictures from downstairs

Some pictures from today.