Plastering starts

It's now time to make the walls pretty. All walls will be plastered.
This process is totally manually and labor intensive, so this will take very long time.
Exactly as in other processes, the quality of the material (plaster) is very high. The Xpert Platinum plaster from SCG was selected, this kind is very resistant to cracking and makes smooth walls.

The walls will be wet from the day before the plastering.

Good quality of plaster was selected


This part of the outer wall needs to be plastered before the last part of the roof is mounted. All to keep the roof clean.


Some plastering result

Its possible to plaster walls inside at the same time only if it's not an outer wall.


Some result


Labor intensive work



Some before and after picture on the master bathroom wall



Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser