Skip to main content

Assorted Pictures 1:st of March 2018

I have som assorted pictures of the building made today. Just sharing...

This pictures is taken from the deck on the backside and shows the door frame, dining room and in the end (or house front) the living room.

Most walls are made with light-weight concrete blocks (the white one), but all bathroom walls the small red bricks are used (as always in Thailand).

The roof structure is very well made

More roof structure

Impressive welding.

Like art!

Again..

The foreman do some work on the roof too.

They use a lot of tree.

Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser