Skip to main content

Assorted Pictures 1:st of March 2018

I have som assorted pictures of the building made today. Just sharing...

This pictures is taken from the deck on the backside and shows the door frame, dining room and in the end (or house front) the living room.

Most walls are made with light-weight concrete blocks (the white one), but all bathroom walls the small red bricks are used (as always in Thailand).

The roof structure is very well made

More roof structure

Impressive welding.

Like art!

Again..

The foreman do some work on the roof too.

They use a lot of tree.

Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Many bars

Back to work, Today the workers done many rebar "cages" after delivery of materials and a rebar machine. The three cages that was done before was made of 16 mm rebar that was a leftover from their last work. Now the rebar is 12 mm (as planned). Some pictures: