Outside stairs

There will be one stair on the backside to the veranda and one in the front to the entrance. The workers build forms that is measured very exactly. A lot of tree is used.

Form work

The structure is soon done, some more concrete and later on the tiles/tree

The entrance stairs


Needed one more beam so that the stair will last for at least 50 years

Left side: The form more or less removed from the stairs
Right/middle: Temporary entrance 

Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser