More pictures on the sewage

The workers have been doing a great job with the waste water part for some days now. I here share some pictures



This is the plan for the pipes going to the community sewage


In real, very big pipes. I guess I can hook up a multi-family house to this pipes too.



The 1600L sewage tank from the toilets on a concrete platform.


Soon filled up with soil. The tank was filled with water before the filling started. All to keep it in shape and place.

From the top.

The pipes going directly to the sewage pipes comes from the sinks and not from the toilet.

More pipework

Tank will soon disappear, only a pipe if we needs to get rid of the content in the future.



Last inspection place before the community connection.

It will soon be hidden by the soil.


Connected and ready. The only thing needed no is the lid.


This is the welded frames that will be used in the construction of the lids to the sewage inspection holes. I will show later on how they looks when they are ready.

The foundation to the grase trap is soon ready. It will be very easy to inspect and clean.

Comments

Popular posts from this blog

Moving the Office

One of the first things that the team set up on the land was the small BIO (Building Inspector office). Now its time to dig here for the waste-water pipes and also the place where the parking should be set up. So the move was done this morning.

Roof - Part 2

The roof took three days. The put tiles both on the high roof and most part on the lower roof. They decided to wait with the part that is between the big and low part because the plastering work on the high wall could make the tiles very dirty and difficult to clean after. Another solution should have been covering the part, but that was not an option - they are the experts, so it's just to lean back and let them do what they want. Lats and lifting tiles. Some parts done Under the high roof Notice the security hooks and helmets (not?). Low roof Most ready now. The team will now wait for the plastering work on the outer walls on the high part and then its time to finishing up.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels