Skip to main content

Frames almost ready

It took many days to mount the frames, but now they are almost ready. The only one left is the the small window frame in the storage room.
All frames are carefully fixed and will get concrete around. The frames will let the windows and doors work without problems for many years - so a lot of time is spent here.

These frams will host foldable doors between the back outside area and 
the Thai kitchen (left) and dinner area (front).


Thai kitchen windows


The living room windows. 6 windows in front and four on the right. 
On the left side you see some parts of the entrance.


The entrance will have two doos and lights on both sides.


Left: 4 windows between the living and dining room, 6 windows in the dining room to the right.


This picture shows the view from the dining room. 
Folding doors on the left, door to the Thai kitchen on the right



Comments

Popular posts from this blog

Blueprint

The first version of the blueprint. About half of the house is one floor, the bedrooms are raised as a second floor with mostly open areas below (laundry and outdoor relax area). I guess there will be some small changes here and there during the building process, but in general this is the house. Even if it looks like that, we will not have any cars under the bedroom.

Community water

Perfect timing. The community have started to dig and mount water pipes right outside my fence, so I will get water from both the well and the community = no future water problems!

Pictures from downstairs

Some pictures from today.