Frames almost ready

It took many days to mount the frames, but now they are almost ready. The only one left is the the small window frame in the storage room.
All frames are carefully fixed and will get concrete around. The frames will let the windows and doors work without problems for many years - so a lot of time is spent here.

These frams will host foldable doors between the back outside area and 
the Thai kitchen (left) and dinner area (front).


Thai kitchen windows


The living room windows. 6 windows in front and four on the right. 
On the left side you see some parts of the entrance.


The entrance will have two doos and lights on both sides.


Left: 4 windows between the living and dining room, 6 windows in the dining room to the right.


This picture shows the view from the dining room. 
Folding doors on the left, door to the Thai kitchen on the right



Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser