Today the concrete truck arrived again, this time for the first floor. The truck can not reach up to the floor so all concrete where lifted up in buckets. The truck did have some concrete left, so they fixed a platform beside the well for the tank at the same time.

Starting to water the prefab floor

A lot of buckets (and people) is needed

The expert

Looks good



Building a form, add rebar net and fill up with concrete while the truck are waiting - cool


Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser