Skip to main content

Completing the floor beams on first floor

For some days now, the work have been focused to get the floor beams on first floor done.
I have here a lot of pictures from the framework to the ready beams.

Setting up the metal forms

Forms in place

Measures the bathroom floor

A lot of tree is needed to stable the forms



The concrete truck cannot get the concrete up to the forms, so there is a lot of manual lifting.




Forms removed

Special chemicals used to keep the concrete moist for the first important days.



Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser