For some days now, the work have been focused to get the floor beams on first floor done.
I have here a lot of pictures from the framework to the ready beams.
I have here a lot of pictures from the framework to the ready beams.
Setting up the metal forms
Forms in place
Measures the bathroom floor
A lot of tree is needed to stable the forms
The concrete truck cannot get the concrete up to the forms, so there is a lot of manual lifting.
Forms removed
Special chemicals used to keep the concrete moist for the first important days.