Next layer of beams

The ready floor on the left side of the house will be 1.2 m from the ground, so we need a second layer of beams. There will be a brick layer and then beams connected to the pillars.
Many pictures below

 Bricks and start with the rebars on level 2


This house will not fall apart so easily. Quite thick rebars.

In some places they are using the small red bricks. They are better if you need to attach anything heavy to the wall.






Wrapping the pillars with plastic so it burns slower and keep the moist.

First high forms is are mounted.




They need to be sure the forms doesn't break then heavy concrete is poured into the forms in a couple of days


More distances to keep the rebars from the form. They need a lot. 

It's not only men that have muscles, this lady bends most of the rebars.


Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser