Building start - Breaking ground

Time to start.
The house ceremony is planned for first of November, but that doesn't stop the newly arrived workers to start digging. The soild was to hard to dig by hand, so the builder ordered in a digger. Here is a collection of pictures from the first digging day.
Checking heights - very important

Digging, the holes will be 1.5 meter deep.

Inspecting

There will be high piles of soil on the land

Digger, Japanese quality.

Packing sand at the bottom of hole.

Frames for the first layer of concrete. 
In Sweden we use polystyrene sheets instead.

Concrete work.

More inspections

Checking height.

There will be many holes. 25 platforms will be used to hold up the house.
Some holes will have more than one platform.

OK, first layer done in this hole.


Quite a lot was done after just one days work.

Comments

Popular posts from this blog

Pictures from downstairs

Some pictures from today.

Arrival of the roof tiles

The roof tiles arrived today at 06.00 in the morning. No pallet, it looked like they have unloaded the truck manually. They delivered over 4000 tiles! One of the three piles of tiles delivered. Some broken due to the bad handling. Lintels in aluminum to hold the roof tiles. More lintels

Parking

The builders have started with the pillars of the parking. This is just the start of the parking project. It's important to fence-in a building project to keep non-authorized people out. Foreman is checking Forms in place Pouring cement into the forms The foreman with his laser