Skip to main content

Posts

Ceiling first of June

The team worked very quickly in the morning, but after that they ran out of material for the isolation together with the electricity black-out, nothing more could be done except go fishing.

Soon looks like a house

Here is some pictures of something that looks more and more like a house.

Ceiling team arrived

Today 8 young men arrived. They will work with the ceilings in the house. Isolation and aluminium bars will be ready today - hopefully. The builder was very determined about the selection of the isolation. He has been working with several kinds and brands, and these quite simple sheets was recommended by him. Using laser to mark things up. Aluminium bars, right kind and standard. Start Isolation sheets Progress Quite high up Flip-flops and a cool t-shirt, what else do you need to protect yourself

Fence Thursday

Another day and some more progress on the fence. Here is some pictures... Wow... I just realized that this is blog post number 100 (I hope it will be 100 more).

Entrance rails, stairs and oher wood details

Today the carpender and his wife was fixing wood details on the front by the entrance. As before, it will not have the full finish before the painters has done their job, but I think it looks quite ok even before that. Entrance stairs Working... Time for the heavy doors. Nearly done! The building inspector (Ang) is checking. We need a lock too

A lot of work with the fence

About four people from the team are doing fence-work right now. The fence will be very durable, I guess I will never get any problem with it. They are using the same technique as when they build a house.

Windows

Some pictures of the windows. All windows will open in the same direction - Swings to the right. They are mounted in the top and bottom.